Unit | Design | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results |
1 | PWR Westinghouse AP1000 | 3400 MW | 1250 MW | planned or under construction | exp. 2028 | exp. 2088 | Case A Case B |
contamination and dose |
2 | PWR AREVA EPR | 4612 MW | 1630 MW | planned or under construction | exp. 2028 | exp. 2088 | Case A Case B |
contamination and dose |
3 | BWR GE/Hitachi ABWR | 3926 MW | 1420 MW | planned or under construction | exp. 2028 | exp. 2088 | Case A Case B |
contamination and dose |